Stillwater Lift Bridge ends 2013 schedule

STILLWATER, Minn. (AP) — The Stillwater Lift Bridge has ended its summer lift schedule for the year.

That means boaters may encounter delays as they try to get under the bridge across the St. Croix (kroy) River between Minnesota and Wisconsin.

The last day of the full lift schedule was Tuesday.

The bridge will remain in the down position until next spring. A 24-hour notice is needed to request the lift section be raised.

Boaters and other water traffic can request the lift be raised by calling Metro Dispatch at 651-234-7110.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s